1840m
long
INDUSTRY, INNOVATION AND INFRASTRUCTURE
Build resilient infrastructure, promote sustainable industrialization and foster innovation
Economic growth, social advancement and action against the climate emergency depend largely on investment in infrastructure, sustainable industrial development and technological progress. Today, about 1 billion people live more than 2 km from a roadway, 940 million live without electricity, and 663 million lack improved drinking water sources.
ACCIONA participates in the entire infrastructure construction value chain, from the identification of opportunity, design and execution, to the operation and maintenance of the constructed works, using the most advanced and innovative techniques.
Performance quality and safety are two of the criteria that maximize the company's value proposal in the development of large infrastructure projects and that differentiate it from other competitors in the construction field.
The project was carried out using the NATM (New Austrian Tunnelling Method) conventional tunnelling method, excavating the rock by mechanical means in an urban area with several services and maximized integration in the city.
GENERAL INFORMATION
- Location: Bilbao, Spain.
- Contract type: Design and construction.
- Infrastructure: Extension of Line 2 over a 920-m section, including the construction of the 108-m long Sestao cavern station.
- Year of project completion: 2004